Arrow Canyon Solar, LLC

About

EDF Renewables signed a PPA with NV Energy for the Arrow Canyon Solar Project. The 200 MWAC solar project includes a 75 MW-5hr battery storage project and is located in Clark County, Nevada. It’s expected to be up and running in December 2022.

Located on the Moapa Band of Paiute Indians Reservation, 20 miles northeast of Las Vegas, Arrow Canyon Solar Project will benefit the Moapa Tribe and local community over its operating life through land lease, tax and other payments and 250-600 temporary construction related jobs. Arrow Canyon is also specially designed to generate clean energy while minimizing impacts to wildlife, habitat, and other environmental resources of the Moapa tribal lands. The project will utilize high efficiency bifacial solar photovoltaic (PV) modules in conjunction with a tier 1 energy storage system supplier.

In addition to its economic benefits for the Tribe and Clark County, the project will utilize an innovative design to generate enough clean energy to meet the consumption of up to 64,000 average Nevada homes. This is equivalent to avoiding more than 464,000 metric tons of CO₂ emissions annually1 which represents the greenhouse gas emissions from 98,000 passenger vehicles driven over the course of one year.

EDF Renewables’ Asset Optimization group will perform operations and maintenance services for the life of the Project. The group will provide NERC compliance support, remote monitoring, and balance-of-plant management to maximize power production.

200
Capacity
2022
Date of Operation

Resources

EDF Renewables North America Signs Power Purchase Agreement with NV Energy
Read Article