Grand Meadow Wind

Developer: EDF Renewables
Owner: EDF Renewables
Operations an: EDF Renewables
Power Purchaser: Xcel Energy
System Size: 100.5
Date of Operation: May 2009

The Grand Meadow wind farm spans a stretch of farm fields six miles long and four miles wide, and is spread out over roughly 10,000 acres southeast of Interstate 90 three miles north and three miles south of Hwy 16, in Grand Meadow, Clayton, and Dexter Townships in Mower County.  It became operational in 2009.